• Find your home

    Enter Location or development name
    Price range
    Number of bedrooms

    Property type

    See advanced options

Land at former Rossington Colliery

Site of the former Rossington Colliery - West End Lane - New Rossington - Doncaster - South Yorkshire

Our proposals for the former Rossington Colliery.

  • Overview

    The former Rossington Colliery already has the benefit of Outline Planning Permission for a mixed use development (12/01107/OUTA); consisting of a local superstore, hotel, restaurant, fast food outlet, petrol station, community building, land for a new Primary school and up to 1200 residential units.

    Taylor Wimpey now has detailed planning approval for 96 dwellings in the location identified.

    Link to Planning layout

  • About the site

    Rossington itself is a former mining village, surrounded by countryside. The brownfield site was formerly Rossington Colliery and Taylor Wimpey's parcel is 7.2 acres in size.

    The site is bound to the north and west by the River Torne, and will be accessed from New Rossington via West End Lane.

    The development of the former colliery site is facilitating the construction of the Finningley and Rossington Regeneration Relief (FARRR's) Road, which will link Rossington village to Junction 3 of the M18 and Robin Hood Airport.

    In terms of amenities, the market towns of Bawtry and Tickhill are around 6 miles away, with the larger town of Doncaster just 6.5 miles from the site. Doncaster benefits from a railway station, The Dome Leisure Complex, and Doncaster Racecourse; as well as a variety of restaurants and shops. Warren Golf Course is situated less than 3 miles from the site. 

    2Layout Masterplan Base


  • What's proposed?

    Taylor Wimpey now has detailed planning approval for 96 dwellings, consisting of 3 and 4 bedroom homes in terrace, semi detached and detached format. The house types will be similar in style to those currently being built on our nearby site Westlands.

    The masterplan and design code were approved with the Outline permission and our development fits into this overall masterplan.

    Layout Image 2316

    Planning layout

    4 - House Types

    Artists impression of typical Taylor Wimpey properties

  • Community benefits

    The development of the Former Rossington Colliery is facilitating the construction of the Finningley and Rossington Regeneration Relief (FARRR's) Road, which is a new highway from Junction 3 of the M18 to Robin Hood Airport, with links into Rossington village.

    Doncaster MBC would receive an estimated total of £601,000 in New Home Bonus.

    The scheme will generate employment and job creation over the 3 year build period.

    The development would increase spending in the local shops and services.

    Taylor Wimpey_HO_Lifestyle-0048

  • News and Updates

    Proposed timescales:-

    June 2016 - works will commence on the roads and sewers infrastructure.

    November 2016 - Sales centre and Showhomes to open.